Smart Zebra Crossing Projection System – Construction Case Study

2026-08-03
Case Details

Smart Zebra Crossing Projection System – Construction Case Study 

BERTIN LIGHTING | WWW.BERTINLIGHTING.COM

1. Project Background

Location: Intersection of arterial and secondary roads in a provincial capital city

Surroundings: Large residential community, elementary school, commercial complex, multiple bus stops

Pre-renovation Issues:

  • 67% of traffic accidents occurred at night

  • 42% accident increase in rain/fog conditions

  • ~30% of pedestrians crossed while using phones

  • Nighttime vehicle yielding rate below 35%

  • Zebra crossing illuminance only 60% of standard value

Objectives: Enhance nighttime and adverse-weather visibility, strengthen two-way warnings, reduce accidents, increase yielding rates, and collect traffic data.

2. Site Survey



Parameter Data
Intersection Type Cross intersection
Lanes 6 lanes (both directions)
Zebra Crossing Length 18 meters
Zebra Crossing Width 5 meters
White/Black Stripe Width 45cm / 55cm
Daily Pedestrian Flow 8,500 persons
Daily Vehicle Flow 32,000 vehicles
Installation Method Forward vertical projection
Installation Height 7.5 meters

3. Product Selection

Core Configuration:



Equipment Specification Qty
Smart Projection Light 800W light source / 1000W total 2 units
Smart Control Cabinet PLC + 4G module 1 set
Sensor Kit Light + Temp/Humidity + Rain 1 set
Signal Collector Traffic light acquisition module 1 set
Mounting Columns Galvanized steel, 8m height 2 poles

Key Principle: Always prioritize brightness over coverage area. Insufficient brightness renders projections invisible during daytime, defeating their warning purpose.

4. Installation (7 Days)



Phase Duration Key Tasks
Site Re-measurement 1 day Precise positioning, deviation ≤ ±5cm
Foundation Pouring 2 days Pit φ0.7m×0.7m depth, C30 concrete
Column Installation 1 day Levelness error ≤ 2mm
Cabling 1.5 days RVV 3×4mm² power + fiber/4G redundant links
Wiring & Debugging 1 day Signal acquisition + equipment wiring
System Integration 0.5 days Full function test & acceptance

Signal Wiring Essentials:

  • Acquire traffic light power line voltage (AC 220V) from signal cabinet

  • Connect via opto-isolator for safety

  • Green ON → Green projection (Walk); Red ON → Red flashing (Don't Walk)

  • 5-second signal loss → Auto safe mode (slow yellow flashing)

5. Commissioning & Acceptance

Calibration Items: Level calibration, alignment (deviation ≤ 2cm), focus calibration, brightness & color calibration

Test Results:

  • Signal response: ≤ 156ms

  • Sensor trigger: ≤ 0.8 sec

  • Remote control: ≤ 1.2 sec

  • Driver recognition distance: ≥100m (daytime), ≥200m (night)

6. Performance Data

Accident Data Changes:



Indicator Before After Change
Night accidents (monthly avg) 3.7 0 -100%
Adverse weather accidents (monthly avg) 2.3 0.5 -78%
Pedestrian injury accidents (monthly avg) 2.0 0 -100%
Nighttime yielding rate 32% 78% +144%
Phone-users running red light 12/hr 3/hr -75%

User Satisfaction: 4.7/5.0

7. Key Takeaways

  1. Precise surveying is foundational – cm-level accuracy achieves 98%+ alignment with existing stripes

  2. Over-specify when in doubt – one power grade higher ensures daytime visibility

  3. Standardized installation ensures longevity – proper labeling, terminal crimping, waterproof sealing

  4. Close coordination with traffic authorities – signal acquisition must be compliant and safe

  5. Design for maintenance from day one –预留 access, spares, and remote diagnostics

8. FAQs

Q: Visible in direct sunlight?
A: Yes. The 800W high-brightness unit remains clearly visible even at noon on sunny days.

Q: Does it cause glare for drivers?
A: No. Projection is directed at the road surface, and brightness automatically reduces at night.

Q: Is internet connectivity required?
A: It can run independently, but cloud connectivity enables remote monitoring, data collection, and firmware upgrades.

Q: What is the lifespan?
A: LED light source: 50,000 hours (approx. 5.7 years continuous use).

Q: Operates in heavy rain?
A: IP65-rated. Rain triggers automatic brightness boost and red warning mode.

Conclusion

Through professional surveying, precise product selection, standardized installation, and rigorous commissioning, this project transformed a high-accident intersection into a safe and efficient traffic node. BERTIN LIGHTING remains committed to intelligent lighting control technology, safeguarding every journey with professional-grade illumination.